Separate one-time and recurring spending
A miner’s purchase price is only one part of the amount needed to start. Delivery, installation, electrical work, ventilation, and network equipment can change the total. Ongoing energy, service fees, maintenance, and repairs need their own budget.
Keep cash required to launch separate from expected operating margin. A positive calculator result does not pay an upfront invoice. This checklist is a planning worksheet rather than accounting, tax, or investment advice; obtain local quotations and applicable professional advice.
Step-by-step
- List launch costs. Record hardware, delivery, applicable import charges, site preparation, metering, and installation as separate line items with quote dates.
- List running costs. Estimate energy using measured watts and hours, then add cooling, connectivity, service charges, and a repair allowance based on your own evidence.
- Test a reserve. Decide how many months of expenses can be funded if revenue is lower or equipment is unavailable. Do not book uncertain resale proceeds as cash.
Worked example
Illustrative example. A hypothetical USD 2,000 miner needs USD 300 delivery and USD 700 installation. Launch spending is USD 3,000 before operating reserves, not USD 2,000.
The extra spending also changes simple payback if you include it in the capital amount. Keep assumptions visible so readers know which costs were modeled.
Common mistakes
- Using gross coin revenue as disposable cash.
- Omitting installation because a seller lists only the machine.
- Assuming repairs or downtime will always be zero.
Questions and answers
Should I include resale value in the base case?
Treat it separately. Condition, demand, and future network economics affect resale. A conservative cash-flow plan should remain understandable without an assumed exit price.
Apply this to your setup
Create separate totals for launch spending, monthly operating cash, and contingency reserves. Mark each line as quoted, measured, or assumed and give it a date. Keep excluded costs visible rather than treating them as zero. Compare the full commitment with the cash available before selecting a hardware order.